Energy

Tertiary Decree: what your office works need to anticipate.

From 1,000 m² of floor space used for tertiary (service-sector) activities, owners and tenants must reduce final energy consumption along a trajectory set by law. A fit-out project is the right time to prepare for it.

By Quentin Piepszownik, architectUpdated on

Topic
Energy
Sources (in French)
4 official or professional texts and documents, cited at the end of the page
Checked on
9 October 2026

Who is covered?

The Éco Énergie Tertiaire scheme, often called the “Tertiary Decree” (décret tertiaire), applies to buildings, parts of buildings or groups of buildings with at least 1,000 m² of floor area used for tertiary activities. The owner and the tenant are both subject to it, each for what falls within their responsibility (Construction and Housing Code, art. L174-1; art. R174-22 et seq.).

The targets

DeadlineReduction in final energy consumption
2030−40%
2040−50%
2050−60%

The reduction is measured against a reference year, or achieved by meeting an absolute consumption value set for each category of activity.

Reporting, and the risks

Consumption for the previous year is reported every year on the OPERAT platform, by 30 September at the latest; failing this, the prefect serves formal notice on the party concerned to submit it. If the targets are not met without justification, an action programme must be drawn up: failing to draw one up after formal notice, or failing to comply with it, exposes the party to an administrative fine of up to €1,500 for a natural person and €7,500 for a legal entity, and to publication of the formal notices that went unheeded.

Building automation and control (BACS)

Tertiary buildings whose heating or air-conditioning system exceeds 290 kW have had to be equipped with a building automation and control system since 1 January 2025. For installations above 70 kW, the deadline initially set at 1 January 2027 was postponed to 1 January 2030 for existing buildings by Decree no. 2025-1343 of 26 December 2025.

What this changes for an office project

  • The lease and its annexes specify who does what: reporting, works, consumption data.
  • Fit-out affects consumption: lighting, ventilation, controls, how space is occupied.
  • Reducing floor space or using it better also reduces consumption: real-estate sufficiency (sobriété immobilière) is part of the answer.

Your situation is not quite this one?

Every project starts with a precise question. Describe yours: headcount, floor area, deadline, what isn't working today.