Guides

Before the works, the right questions.

Guides to prepare an office decision in France: every rule cited links to its text, every figure to its source, with the date it was checked.

Author
Quentin Piepszownik, architect
Checked on
9 October 2026
Topics
Space use, regulations, energy, employee relations, comfort, budget, timeline
Space use

Office occupancy rate: measure before you decide.

Attendance, occupancy, utilisation, capacity: four measures that are often confused, and why the average is misleading.

Regulations

Fitting out offices: what the French Labour Code requires.

Lighting, ventilation, toilets, accessibility, maintenance file: the articles to know, and the exact values.

Regulations

Offices open to the public: when your floor becomes an ERP.

Type W, 5th-category thresholds, headcount calculation, works authorisation in four months: what changes when you receive the public.

Energy

Tertiary Decree: what your office works need to anticipate.

1,000 m², −40% by 2030, annual reporting on OPERAT, building automation (BACS): the obligations and what they change for a project.

Employee relations

Office projects: when and how to consult the works council (CSE).

50-employee threshold, “major alteration”, time limits of one to three months, expert assessment: build the works council into the timeline from the start.

Comfort

Office acoustics: concentrating and talking in the same place.

What the law requires (little), what the NF S31-080 standard recommends, and why decorative panels are not enough.

Budget

An office project budget: count everything, from the start.

Works, furniture, IT, relocation, fees, contingencies, reinstatement: the items in a complete budget, and the ones that get forgotten.

Timeline

An office project timeline is built backwards.

Permit, prior declaration, ERP authorisation, works council consultation: the time limits set by law, and how to plan backwards.

Getting started

Preparing the first conversation: what saves time.

Headcount, attendance, plans, lease, timeline, pain points: the list of useful information, even if incomplete.

A question that isn't covered here?

Ask it directly: it may become the next guide.